I think that entire process burned us out a bit and we took a week off from kitchen work and enjoyed the break.
This week we, and by "we" I mean DH, are doing the new lighting for the kitchen. DH took down the sheet-rock from the ceiling yesterday and tonight he is placing the new lights in the room (once the old lights cans are removed).


The new lighting will consist of 5" cans in the general areas and then some 3" lights that swivel for the accent lights (mainly on our back wall where the artwork will hang). We are leaving the accent lights that are currently over the cook-top and sink spaces. They are placed within the duct and would be hard to patch the over-sized hole it would create if we went with a smaller light.
1 comment:
Oh my....that looks like a major project! What was the secret for removing the tile? I have a bathroom where I need to "undo" the floor.